Case · On-Site

Customer Installation

A look at how the portable system is deployed and started up on a customer site.

Place 1.mp4 in the site root to play the video here.

01 / On Site

Portable, Fast to Deploy

The system arrives pre-connected in a protective case and is assembled on site, so deployment is quick.

Operators connect air, water, signal and camera, ventilate, then start inspecting through an existing furnace port.

02 / Deployment

On-Site Set-Up

1

Unpack

Open the protective case and check the modules.

2

Connect

Connect air, water, signal and camera.

3

Ventilate

Turn on air and ventilate before insertion.

4

Inspect

Insert the probe and start live inspection.

5

Pack Down

Withdraw, stop cooling and repack safely.

03 / In the Field

What Deployment Looks Like

Portable caseQuick assemblyExisting portsLive inspectionMove between furnaces
04 / Outcome

Why Customers Like It

Fast on-site set-up
Move between furnaces
No fixed installation
Online inspection
Repeatable results
Easy to transport
Get Started

Deploy It on Your Site

Tell us your site conditions and furnace ports — we will help you plan the deployment.